Infrastructure Development

The local government implemented a total of 14 infrastructure projects in 2020. The infrastructure projects were categorized as follows:

Table 38: Infrastructure Projects Implemented, 2020

CATEGORY

PROJECT TITLE

PHYSICAL TARGET/QUANTITY

LOCATION

CONTRACT AMOUNT

INFRA

REHABILITATION OF WATERWAYS (DESILTING/DECLOGGING OF CREEKS)

2KM

BRGY.SAN NICOLAS AND CANDATING

1,998,000.00

INFRA

UPGRADING/IMPROVE-MENT OF PROPOSED CENTRAL TERMINAL

19,800 cu.m. of filling materials

BRGY.MANGGA CACUTUD,ARAYAT,PAMPANGA

4,997,500.00

INFRA

ROAD IMPROVEMENT

150m length x5m width x.2m thickenss

BRGY.TABUAN,ARAYAT,PAMPANGA

1,268,600.00

INFRA

ROAD IMPROVEMENT

264 LMX5.0X0.15

BRGY.PLAZANG LUMA,ARAYAT,PAMPANGA

2,260,000.00

INFRA

REHABILITATION OF WATERWAYS (DESILTING/DECLOGGING OF CREEKS)

2KM

BRGY.LA PAZ TURU AND GATIAWIN

1,998,000.00

INFRA

REHABILITATION OF WATERWAYS (DESILTING/DECLOGGING OF CREEKS)

2KM

BRGY.ARENAS and San Antonio,Arayat,Pampanga

1,998,000.00

INFRA

LOCAL ACCESS ROAD REHABILITATION/IMPROVEMENT IN BARANGAY BATASAN-SUCLAYIN-CAMBA

767L.M.

Brgy.Batasan,Suclayin and Camba,Arayat,Pampanga

12,587,000.00

INFRA

Construction of Drainage Canal (Continuation of Sta 00+245)

245 L.M.

BRGY.PLAZANG LUMA,ARAYAT,PAMPANGA

5,000,000.00

INFRA

ROAD IMPROVEMENT

170 LM

BRGY.CAMBA,ARAYAT,PAMPANGA

1,970,560.00

INFRA

REHABILITATION OF WATERWAYS (DESILTING/DECLOGGING OF CREEKS)

500LM

BRGY.GUEMASAN,ARAYAT,PAMPANGA

506,000.00

GOODS

CONSTRUCTION OF DRAINAGE CANAL

160m

BRGY.PLAZANG LUMA,ARAYAT,PAMPANGA

1,400,000.00

GOODS

CONSTRUCTION OF MATERIAL RECOVERY FACILITY EXTENSION

100sqm

BRGY.TABUAN,ARAYAT,PAMPANGA

374,014.00

GOODS

Construction of SENIOR CITIZEN CENTER

204 SQM

BRGY.PLAZANG LUMA,ARAYAT,PAMPANGA

854,917.00

GOODS

Construction of COVID CENTER

504 SQM

BRGY.PLAZANG LUMA,ARAYAT,PAMPANGA

721,127.00

Municipal Facilities

CONSTRUCTION OF COVID CENTER

The Construction of Senior Citizen Center started when the pandemic hit the country in the first quarter of 2020. The 50-bed capacity structure will serve as an Isolation facility to suspected covid patients and asymptomatic confirmed patients.

Img1649
Img1651
Img1650

CONSTRUCTION OF DSWD SENIOR CITIZEN CENTER

The newly-inaugurated 204-square meter building of DSWD and Senior Citizen Center is now fully operational as the offices of the MSWDO, PWD, and Senior Citizen transferred in the second quarter of 2020.

Img1727
Img1726
Img1728
Img1729
Img1741
Img1742
Img1743
Img1744
Img1683
Img1684
Img1685
Img1686
Img1715
Img1716
Img1717

CONSTRUCTION OF MATERIAL RECOVERY FACILITY EXTENSION

Thru the grant from the Environmental Management Bureau, additional funds were used to construct the extension of the Material Recovery Facility located at Brgy. Tabuan, Arayat,Pampanga.

Img1760
Img1761
Img1762
Img1763
Img1775
Img1776
Img1777
Img1778

Flood Control

REHABILITATION OF WATERWAYS

DESILTING/DE-CLOGGING OF CREEKS

During rainy season, creeks are clogged due to the denser growth of water hyacinth which impedes the flow of water. In order to resolve the problem, the Local Government of Arayat has allotted budget to rehabilitate the creeks and prevent flooding among the barangays near the area.

Img1786
Img1787
Img1788
Img1789
Img1790
Img1791

CONSTRUCTION OF DRAINAGE CANAL

The Construction of Drainage Canal project was received as an award from the Department of Interior and Local Government for winning the Performance Challenge Fund (PCF) Program. It was given as an incentive  by passing the Seal of Good  Local Governance (SGLG) in 2019.The 160 l.m. canal project is located in Brgy.Plazang Luma and was certified complete last August 12,2020.

Img1823
Img1849
Img1850
Img1851
Img1821
Img1822

The project received the award of BEST PERFORMING LOCAL GOVERNMENT UNIT  in Pampanga on the implementation of the FY 2019 Performance Challenge Fund (PCF).

Img1881

CONSTRUCTION OF DRAINAGE CANAL (Central Terminal)

As part of the development in the Central Terminal, ng LGU implemented the project of Construction of Drainage Canal from the support fund received by Arayat from the Provincial Government of Pampanga amounting to 5,000,000.

Img1895
Img1896
Img1897
Img1898
Img1899
Img1900

Access Roads

UPGRADING/IMPROVEMENT OF PROPOSED CENTRAL TERMINAL

This project will be helpful for the public transport like jeepneys and tricycles to eradicate the traffic congestion in the area of Arayat Public Market.The goal of this terminal development is to provide the community  a better access of the public transportation system.When the Department of Interior and Local Government launched the project Road Clearing, the LGU has designate the central terminal to be a centralized location for public transport vehicles like jeepneys,bus and and tricycles.

Img1932
Img1933
Img1934
Img1931

ROAD IMPROVEMENT PROJECTS TO VARIOUS BARANGAYS

In order to provide additional access to the public, the Municipality has implemented road projects to various barangays as follows:

  • 264m -Brgy. Plazang Luma
  • 150m-Brgy.Tabuan
  • 170m- Brgy.Camba

Img1963
Img1964
Img1965
Img1962

LOCAL ACCESS ROAD REHABILITATION/IMPROVEMENT IN BARANGAY BATASAN-SUCLAYIN-CAMBA

The 767-meter road was completed in 2020 and has complied all the necessary requirements of the DILG in terms of Physical and Financial accomplishments. The said project was funded by the DILG-Assistance to Municipalities (AM 2020) and will benefit the three barangays; Batasan, Suclayin and Camba.

Img2001
Img2002
Img2003
Img2004
Img2005
Img2006